Wind Power Project

BPA is in talks with prospective wind power developers for a collaboration to set up a pilot wind park with turbine capacity below 1MW to establish the technical feasibility and economic viability of wind power development in Ghana. The successful demonstration of the pilot phase will lead to scaling it up and further investment in wind power parks.

BPA, thus far, has in operation a wind turbine as its first pilot at its head office located in Accra where it is hybridized with the existing solar plant to augment the power generation for the building. The power generated from the wind turbine is used to offset some of the power consumed by the building

1MW Wind Power at the office, BPA Heights